The City of New Haven is requesting proposals from a consultant with demonstrated experience in stabilizing compromised historic industrial structures and utilizing the Secretary of the Interior Standards for Historic Properties for a planning and adaptive reuse study as well as a design of a stabilization plan for The Historic Bigelow Boiler Complex at 198 River Street.
A pre-proposal meeting is scheduled for September 13, 2021 at the Site location 198 River Street in New Haven at 11:00am. The RFP deadline is September 21, 2021. See the full RFP document here.